The project was planned to be constructed by placing supports in the flowing Stream.

 

We found that the .... READ MORE

We found that the construction will be enabled in the fastest, easiest and safest way by constructing a temporary lower metal bridge which we constructed on top of the bridge piers and abutments.

 

This solution enabled us to work without being affected by the flow strength of the Stream and to implement high quality in the required schedule.

 

The project included constructing deep bentonite poles and pole heads in the Stream, by partially and temporarily diverting the Stream and maintaining a dry area during casting. Casting the bridge piers and abutments , some of exposed concrete and some of natural stone coating, casting the bridge paving of concrete and banisters.

 

 
construction of a railway bridge
construction of a railway bridge
construction of a railway bridge

J.LIPINSKT ENGINEERS LTD.

J.Lipinsky Engineers, Ramat Hasharon. P.O. Box 3153 Ramat Hahsaron, Zipcode: 4713101. Israel Tel:+972-3549-5164

יליפינסקי מהנדסים בע"מ, ת"ד 3153 רמת השרון, 4713101. טלפון:03-5495164

This site was designed with the
.com
website builder. Create your website today.
Start Now